Summary
Overview
Work History
Education
Skills
References
Timeline
Generic
EDGAR AMIO

EDGAR AMIO

Piga

Summary

Experienced Construction Superintendent skilled in managing complex construction projects for on-time delivery. Proficient in leading diverse teams to achieve project goals while prioritizing safety standards. Demonstrates strong leadership and problem-solving abilities in fast-paced environments, ensuring successful project outcomes.

Overview

27
27
years of professional experience

Work History

Project Engineer / QC / Superintendent

Pacific Federal Management Inc. (PFM Inc.)
02.2021 - Current

Project Description :

  • Replace Obsolete, Deteriorated, and Inoperable Pad-Mount & Switchgear at EMH-41 with Two(2) New Pad-Mount & Switchgear for P-501 & P-504, NBG Guam (QC Manager)
  • Provide CETASM to Building 368 at New Dog Kennel, Naval Base Apra Harbor Guam, NBGAH (QC Manager)
  • Provide Personnel Gates along Perimeter Fence at Naval Base Guam Munition Sites, NBGMS (Alt Superintendent)
  • Demolish 59 Units, Robert Terrace 300 Area, AAFB, Guam Housing Demolition (Alt. QC Manager)
  • P-290 Ordinance Operation & Admin, AAFB, Guam Generator Building and Trash Enclosure (Superintendent)
  • P-270 Ace Gym & Dining Facility, AAFB, Guam Architectural Finishes (Alt. Superintendent)
  • J755 Urban Combat Training

Patrol Road (Surveyor) (Auto Level)

Sand & Recovery (Superintendent)

Wall Climb 1 & 2 (Alt. Superintendent)

Fence Line (Alt. Superintendent)


Project Involvement :

  • Ensure that the construction activities are performed according to plans and specifications.
  • Responsible for developing and maintaining an effective QC Plan and system.
  • Responsible for resolving issues concerning the projects, such as discrepancy between the drawing and the actual site condition.
  • Responsible for the preparation of acceptable documentation of all QC activities
  • Responsible to identify, schedule and perform the three phases of control on all Definable Features of Work (DFOW) as identified in the construction schedule and cross reference in the QC Plan
  • Attending meetings concerning workmanship and safety issues.
  • Participate in indoctrination and toolbox meetings.
  • Prepares Daily Contractor Production Reports
  • Familiarize with the plans APP and AHA prior to start of the project.
  • Authorize to direct the removal and replacement of defective work and to stop work, which is not in compliance with the contract.

CQCM / Alternate SSHO

Serrano Const and Dev Corp (SCDC)
07.2019 - 01.2021

Project Description :

  • Renovate Military Working Dog Kennel Building 841 & 2416, Andersen Air Force Base (AAFB), Guam
  • Repair Earth Covered Magazine Barr 1 Naval Base Guam Munition Site (NBGMS)
  • Renovate Typhoon Damage BEQ 5 Bldgs. P25007, P25009, P25011, P25016, P25018 AAFB, Guam
  • FY20 Roofing Priority Various Locations, Andersen, AFB, Guam
  • Replace MSA-2nd Building 1104 Gates Andersen Air Force Base, Guam
  • Repair Resilient Flooring B-1600, 1601 & 1604 Andersen Air Force Base, Guam
  • Water Main Corrosion Repair at NBGAH Back Gate from B-1 SV8 Naval Base, Guam
  • Replace Existing 6” & 4” C.I. Pipe with New 8” Butt-Fuse Polyvinyl Chloride (BFPVC) at Route 1 to Sumay Marina Road, NBGAH
  • Replace Sewer Line Running from Nava Hospital to Nambo Insurance Naval Hospital, Guam


Project Involvement :

  • Ensure that the construction activities are performed according to plans and specifications.
  • Responsible for developing and maintaining an effective QC Plan and system.
  • Responsible for resolving issues concerning the projects, such as discrepancy between the drawing and the actual site condition.
  • Responsible for the preparation of acceptable documentation of all QC activities
  • Responsible to identify, schedule and perform the three phases of control on all Definable Features of Work (DFOW) as identified in the construction schedule and cross reference in the QC Plan
  • Attending meetings concerning workmanship and safety issues.
  • Participate in indoctrination and toolbox meetings.
  • Prepares Daily Contractor Production Reports
  • Familiarize with the plans APP and AHA prior to start of the project.
  • Authorize to direct the removal and replacement of defective work and to stop work, which is not in compliance with the contract.

Leadman / Alternate Superintendent

Core Tech International
03.2018 - 07.2019

Project Description :

  • Fabrication of Precast Concrete intended for AAFB Hangar & School Building Projects

(Lead Man / Alt Superintendent)


Project Involvement


  • Assisted in employee training, boosting their skills and knowledge base for enhanced job performance.
  • Reviewed design specifications critically for accuracy, identifying potential issues before they escalated into costly delays or rework situations.
  • Prioritized tasks based on deadline requirements, ensuring timely completion of assignments without compromising quality.
  • Resolved conflicts efficiently among team members, fostering a positive work environment that contributed to successful outcomes.
  • Trained and mentored new employees to enable safe and efficient job performance.
  • Reviewed plans and inspected ongoing construction to keep work in line with project goals.
  • Communicated effectively with clients throughout each stage of the project for transparency regarding progress updates as well as addressing any concerns raised promptly.
  • Oversaw daily operations leading to reduced errors through proactive monitoring of progress.
  • Delivered production and operations reports to management to identify emerging problems and enable targeted solutions.
  • Implemented safety protocols for reduced workplace accidents and improved employee wellbeing.
  • Supported project coordination and smooth workflow by coordinating materials, inspections, and contractor actions.
  • Contributed to problem-solving efforts, identifying root causes of issues and implementing effective solutions.
  • Confirmed that finished products met internal and external requirements to promote uniform quality standard.
  • Served as the primary point of contact between management and frontline workers fostering seamless communication.
  • Completed production logs and maintenance logs to document plant operations and verified adherence to predetermined standards.
  • Reduced material waste, optimizing resource allocation and cutting costs.
  • Inspected completed work to verify quality standards and compliance with criteria.
  • Reviewed project details to specify correct materials and equipment for job sites.

Project Engineer

R-II Builders Inc.
08.2000 - 10.2017

Project Description :

  • July 2013 to October 2017 Pamayanang Maliksi Cavite Mass Housing Project Brgy Pasong Kawayan II, General Trias, Cavite

(Project-in-charge)

  • April 2013 to July 2013 Rehabilitation of Existing Container Yard at Pier 16 and Marine Slipway North Harbor, Tondo, Manila

(Project Engineer)

  • March 2011 to April 2013 UP Chemical Engineering Department Building UP Diliman, Quezon City (Project-in-charge)
  • Aug 2009 to March 2011 North Luzon Railway Corporation Bocaue, Balagtas and Guiguinto, Bulacan (Deputy Project Manager)
  • February 2009 - Aug. 2009 NBP Resettlement Project Brgy. Población, Muntinlupa City (

(Project Engineer)

  • February 2008 – Feb 2009 Pamayanang Maliksi Cavite Mass Housing Project Brgy Pasong Kawayan II, General Trias, Cavite (

(Project Engineer)

  • January 2007 – February 2008 51 Hectares NBP Resettlement Project Brgy. Población, Muntinlupa City

(Project Engineer)

  • June 2004 to December 2006 Malaybalay City Water Supply System Project (MCWSSP) Malaybalay, Bukidnon

(Field Engineer)

  • May 2002 –June 2004 Camarin Medium Rise Housing Project (NHA) Franville II Subd. Camarin, Caloocan City

(General Foreman / Draftsman)

  • Aug. 2000 – May 2002 Pinatubo Hazard Urgent Mitigation Project (PHUMP) (DPWH/MPE) Bacolor, Pampanga

(Cadet Engineer/Field Supervisor)


Project Involvement :

  • Conduct Internal Audit of existing projects.
  • Represent Construction / Technical department in meetings with the inspector and owner.
  • Prepare sub-contractor’s contract agreement.
  • Evaluates sub-contractors’ accomplishment billing reports.
  • Supervise various activities in accordance with established schedule, quality, manpower and other specification.
  • Keep track and/or monitor possible construction problems and assist in determination of appropriate recommendations and solutions.
  • Diligent supervision of various activities, in conformity with established work programs budgetary resources and specified project requirement.
  • Ensures the implementation of quality program adherence to work and materials, but not limited to the requirements of the plans, specification and other related instructions.
  • Implements necessary changes in the plans as per instruction of the Project Manager /Inspectors.
  • Prepares the as-built plans and shop drawings of the project necessary for submittals.
  • Coordinates project implementation with the Inspectors.
  • Performs other duties and functions that may be assigned from time to time.
  • Provide the Final quantification reference for final billing of the project.
  • Handles and manages petty cash fund
  • Monitor and prepare requests for payments for utilities (electric, water bill)and others needed for payment.
  • Prepare attendance reports and payment of Man Hour personnel payroll.

Estimator / Foreman

Municipal Planning and Development Council (MPDC)
12.1998 - 08.2000

Project Description :

  • Municipal Planning and Development Council (MPDC) Projects

(Estimator / Foreman)


Project Involvement :

  • Supervise various activities in accordance with established schedule, quality, manpower and other specification.
  • Estimate projects for funding of Local Government Unit (LGU)
  • Keep track and/or monitor possible construction problems and assist in determination of appropriate recommendations and solutions.
  • Prepare the necessary changes in the plans as per field condition.
  • Coordinate project implementation with MPDC Officers.
  • Perform other duties and functions that may be assigned from time to time.

Education

Bachelor of Science - Civil Engineering

Don Honorio Ventura College of Arts And Trades (DHVCAT)
Bacolor, Pampanga
04-1998

High School Diploma -

Sta. Rita College (SRC) Pampanga
San Jose, Sta. Rita, Pampanga
03-1993

Dila-dila Elementary School
Dilia-dila, Sta. Rita, Pampanga
03-1989

Skills

  • Project management
  • Quality control
  • Team collaboration and leadership
  • Construction management
  • Field support
  • Health and safety compliance
  • Blueprint reading
  • Productivity tracking
  • Site supervision

References

  • Noli J., Serrano, 1-671-632-8840, Serran Construction and Development, #214 Piga St., Machananao East, Guam
  • Roder, Caliung, Core Tech Concrete Batching Plant Manager, 1-671-486-5007, Core Tech Concrete Batching Plant, #388S Marine Corps Drive #400, Tamuning, Guam, 96913
  • Engr. Victor S., Songco, President, (02) 925-3301, R-II Builders Inc., #136 R-II Bldg Malakas St., Diliman, Quezon City
  • Engr. Benigno B., Sangalang, Vice President - Operation, (02) 925-3301, R-II Builders Inc., #136 R-II Bldg Malakas St., Diliman, Quezon City
  • Cermencia, Sanchez, Admin / HR Manager, (02) 925-3301, R-II Builders Inc., #136 R-II Bldg Malakas St., Diliman, Quezon City
  • Ms. Edith, Salvador, (045) 900-4136, MPDC Sta. Rita, San Jose, Sta. Rita, Pampanga

Timeline

Project Engineer / QC / Superintendent

Pacific Federal Management Inc. (PFM Inc.)
02.2021 - Current

CQCM / Alternate SSHO

Serrano Const and Dev Corp (SCDC)
07.2019 - 01.2021

Leadman / Alternate Superintendent

Core Tech International
03.2018 - 07.2019

Project Engineer

R-II Builders Inc.
08.2000 - 10.2017

Estimator / Foreman

Municipal Planning and Development Council (MPDC)
12.1998 - 08.2000

Bachelor of Science - Civil Engineering

Don Honorio Ventura College of Arts And Trades (DHVCAT)

High School Diploma -

Sta. Rita College (SRC) Pampanga

Dila-dila Elementary School
EDGAR AMIO